The swimming pool walls have a Sika waterproof seal
Our new build contemporary house in Halifax has the garage isoquick insulated form work base and velox ICF walls installed adjacent to the swimming pool. The swimming pool walls have a Sika waterproof seal (red strip) and a Sika approved waterproof concrete mix to add an extra layer of protection to the waterproofing of the lower swimming pool area.
Nov 28, 2016


Lower lounge foundation is in place.
Our new build contemporary house in Halifax has the lower lounge isoquick insulated form work base is installed adjacent to the swimming pool walls with the reinforcement in place ready for the concrete to be poured.
Nov 27, 2016


Moving Forward is a contemporary extension in Conservation Area – Black aluminium panels and cedar c
Moving Forward is a contemporary extension in a Wakefield Conservation Area – The black aluminium cladding has been installed and we are waiting for the Juliet balcony underneath the sliding door. The sleek kitchen is being installed with grey units, white Corian work surfaces and feature lighting bulkheads on the ceiling.
Nov 25, 2016


Concrete walls making good progress
Our new build contemporary house in Halifax has the pool concrete walls making good progress with the external tanking in place and the back filling of the pea gravel over the perimeter land drain.
Nov 24, 2016


Contemporary house in Halifax – Swimming Pool Construction
Our new build contemporary house in Halifax has the pool concrete base is set with the reinforcement starter bars ready for the concrete walls. The velox insulated concrete form work system (ICF) is stacked neatly ready for building the swimming pool walls.
Nov 18, 2016


Contemporary house in Halifax – Works commencing
Our new build contemporary house in Halifax has commenced site works. The build has started with the external storm attenuation drain and the new swimming pool which will be built out of reinforced concrete and on an isoquick insulation base.
Nov 15, 2016


Modern Makeover – Brick slips and timber cladding are nearly complete
The brick slips are being installed on the front and are completed on the rear and the timber cladding section on the rear is complete with the front still work in progress. The kitchen now has worktops fitted and looking amazing. We are still waiting for one window which was wrong.
Oct 16, 2016


One of our recently completed makeovers in Rotherham, South Yorkshire. Before and after.
One of our recently completed makeovers in Rotherham, South Yorkshire. Before and after. Professional photos to be completed soon of the interior.
Oct 16, 2016


This months feature in Homebuilding & Renovating – November Edition
Following on from last months edition of the Homebuilding & Renovating we have another feature in this months magazine on one of our completed disability accessible homes in Barnsley for a very special young lady.
Sep 30, 2016


Modern Makeover – Staircase is in and doors are prepared for installation
This bungalow makeover in Lincolnshire is progressing nicely with the brick slip cladding underway, the internal doors have been varnished and the kitchen is being first fix installed.
Sep 27, 2016


Modern Makeover – White render and painting started
The white through colour render has been applied to the render carrier boards and looking good, the painting has started internally with 25% of the rooms completed.
Sep 25, 2016


Modern Makeover – Grey render and plastering started
The grey through colour render has been applied to the render carrier boards and looking good, the plastering has started internally with 50% of the rooms completed.
Sep 22, 2016


Modern Makeover – Making good building progress
The cedar cladding has been stained, the floors screeded, the plaster boarding is complete and external through colour render carrier boards are nearly all done.
Sep 22, 2016


Modern Makeover – Pitched roof tiles our being installed
Modern Makeover is contemporary makeover of an existing bungalow in a Lincolnshire Village – The pitched roof tiles are being installed.
Sep 17, 2016


Modern Makeover – Through colour render boards being installed and windows
The through colour render carrier boards are being installed along with the grey aluminium windows.
Sep 17, 2016


Modern Makeover – Timber Frame Complete
Modern Makeover is contemporary makeover of an existing bungalow in a Lincolnshire Village – The timber frame has been completed and the roof lights installed.
Sep 16, 2016


Modern Makeover – Timber Frame Going Up
Modern Makeover is contemporary makeover of an existing bungalow in a Lincolnshire Village – The timber frame has started to be erected and the bungalow is now on the return journey to becoming a building again.
Sep 15, 2016


Little feature in Homebuilding & Renovating magazine this month
Little feature in Homebuilding & Renovating magazine this month, press the link below to see the article. Pdf copy of the article
Aug 22, 2016


Modern Makeover – Up to dpc
Modern Makeover is contemporary makeover of an existing bungalow in a Lincolnshire Village – Demolition is nearly complete, the foundations are dug and poured, the drainage is being laid and the trench blocks are up to dpc, nearly ready for the timber frame.
May 26, 2016


Modern Makeover – Demolition has begun
Modern Makeover is contemporary makeover of an existing bungalow in a Lincolnshire Village – Demolition has begun.
May 25, 2016


Moving Forward is a contemporary extension in Conservation Area – Vertical slatted timber and grey t
Moving Forward is a contemporary extension in Conservation Area – The vertical slatted western red cedar cladding has been installed with the grey through colour render behind, the existing concrete roof tiles have been relaid onto the pitched roofs, the aluminium fascias and soffits are progressing and the contrast between the old random coursed stone and the clean white render is coming together nicely. I cannot wait for the scaffolding to come down to reveal the extension.
May 20, 2016


Moving Forward is a contemporary extension in Conservation Area – First & Second Fix
Moving Forward is a contemporary extension in Conservation Area – The external through colour render system has been applied, the black aluminium windows have been installed, the black aluminium fascias are still being installed, the internal walls are plastered, the underfloor heating system is operational and the bulk of the internal tiling of the bathrooms is close to completion.
May 19, 2016


Moving Forward is a contemporary extension in Conservation Area – It’s Progressing
Moving Forward is a contemporary extension in Conservation Area – The block work is up to the roof level, the facing natural stone is complete, the stud walls have started to be erected, the grp roof has been installed, the insulation is being laid ready for the underfloor heating and the existing stone pitched roof tiles have been reset on new battens.
May 18, 2016


Moving Forward is a contemporary extension in Conservation Area – The block work is up to the first
Moving Forward is a contemporary extension in Conservation Area – The block work is up to the first floor level.
May 17, 2016