The roof has now been reconstructed on the side dog house and the entrance covered canopy areas are now being constructed. The covered canopies are for the dog play pen on the left of the picture and the car exit point on the right of the picture. The timber battens have been placed onto the building elevation to allow the addition of the cedar cladding for the next stage. Internally the contemporary wood burning stove has been installed and is ready to be plastered in once the main works start again on the internals.

Contemporary wood burning fire Canopy posts being installed Cedar cladding framework