The demolition works have started on the existing building, we have started to remove the mansard running around the building along with filling in existing window positions to allow for the new contemporary internal alterations and external makeover. Some existing openings are being made larger to create picture windows to take advantage of the fantastic surrounding views. Internally we are also reinstating an existing attached outbuilding by putting in a new insulated floor, insulating the walls and repairing the roof.

Internal alterations 03 removing the mansard Internal alterations 02