The upstairs windows has finally arrived and has been installed, the cedar cladding has been stained and installed to perfection. The feature steel beams between the elements has been painted black and the extension is now really taking shape with the internal concrete floor now insitu and the contemporary kitchen being ordered direct from Italy.

t585 CEDAR CLADDING