The rear elevation has now been supported and removed. The plasterboard has been removed from the walls and the ceilings and work can now begin on inserting the steel beams from the new extension into the fabric of the existing building at the first floor level.

Topper ceilings 01 Topper ceilings 02 Topper ceilings 03 Topper ceilings