Fitting in beautifully

This earth sheltered garden office pod cleverly respects its Peak Park setting.

Project: New build earth sheltered garden office, located in Monyash, Derbyshire. Features include: Sound proof construction, Subterranean half basement design, above standard insulation, sedum roof (Living roof), sustainable drainage system and feature timber cladding set into the existing landscape.
(Please wait for the images to load)   CLICK ME TO SEE THE CONSTRUCTION PHOTOS
CLICK ME FOR MORE DETAIL ABOUT THE PROJECT

Scroll Left Scroll Right