The steel beams have been installed, the large beams for the external wall were difficult to install due to the size and the rubble filled walls but eventually they went in after a couple of days of adjustments. The internal beams are installed to hold up the existing floor joists and maintain and zero bulkhead across the two existing spaces. This installation method required the chopping out and inserting of the existing timber floor joists which again took a few days to complete.