The timber frame has started to be erected onsite around the steel frame which is already in place.

photo 5 photo 4 photo 2


The damp proof membrane is installed over the hardcore sub base and the reinforcement mesh which goes into the concrete slab is starting to be installed.

dpm installed 01 dpm installed 02

 


The building has a hardcore base and the steel framed element of the building fully erected. The hole has been dug for the septic tank and it is onsite ready to be installed.

harrogate septic tank installation Harrogate rainwater harvester Harrogate hardcore base