The gable walls have been rebuilt in the original bricks and looking fantastic, the existing brickwork walls that were retained have also been repointed.

Gable ends being rebuilt 02 Gable ends being rebuilt 04 Gable ends being rebuilt 05


The walls are coming back up again and we can start to see the forms of the rooms again. This contemporary barn conversion is beginning to take shape again. The main void for the pool is in place with the traditional brick wall out side of the pool space also taking shape.

Walls coming up Brans conversion pool void Barn conversion walls


The ground works have started on this contemporary barn conversion and we have the main hole dug for the swimming pool along with the existing barn structure being reduced to a safe working height and the new external drainage all installed.

New drainage Barn reduced in height Swimming Pool Hole